As the result of a great collaboration between Tiëstos management team, the SSE Hydro and Martin Professional, an entirely new lighting experience was formed.


“I think the real opportunity we’ve got with this project is that we actually can enable the building to become part of the show. I think that is very unique. It’s a template for what a venue can be. Lots of the venues should come look at this venue and experience the interactivity between the inside and the outside of the venue.”

- Koen de Puysseleir, Tiësto’s Production Designer and Creative Director


Image title


Check out the video here:

https://www.youtube.com/watch?v=yC0x0gcelJY&feature=youtu.be


Martin Equipment used on the SSE Hydro facade

Tripix 1200, 164 pcs.

Tripix 300, 135 pcs.

Tripix Wash, 160 pcs.

Exterior 1200 IP, 2 pcs.

Venue

  • Tiësto and the SSE Hydro
  • Glasgow, UK

Project Team

Back to Case Studies